Encinitas Project
Installed in 2013, this 11.31 kW system features LG 290 Watt solar panels and Enphase M250 microinverters. To integrate the panels with the Spanish tile roof, we worked with a roofer to remove the tiles and lay down a composition roof. We then reinstalled tiles around the system, allowing the panels to lay almost flush with the surrounding tiles.